قالب وردپرس درنا توس
Home / Mac / How do I keep my rooms from change orders? – MacMost

How do I keep my rooms from change orders? – MacMost




11/28/18
11:39

I usually have many full screen apps open at the same time. I have a particular order that I like to keep them in because there are three that I swipe back and forth between often.

Sometimes I enter the Mission Control view so I can see my Spaces at the top and quickly go to Calendar or Mail. However, this often results in the app jumping from Space to the right to the one next to the desktop to the left (or nearby). Then I find myself swiping back and forth and trying to find an app that has moved from its usual position next to the other two that I often use with it.

Is there a way to keep these from changing order when I use them?
̵

1;
Cameron



Source link